Gallery Office Park

Concord, California

Through an accelerated fast-track schedule and careful coordination with the City of Concord construction of Phase 1 of the project began in less than three months from project commencement. The design directive for the two 80,000 SF buildings, clustered around a man-made lake along Highway 24, was to evolve an economical yet striking office complex that created a strong image from the freeway and a more detailed, scaled presence at ground level. Both buildings were located one half level above grade with one level of below grade parking.